# MFG Texaco Stapleton · GeniePoint

Web page: https://ampmap.co.uk/charger/the-geniepoint-network-mfg-texaco-stapleton-uk

MFG Texaco Stapleton is an EV charging site in Mangotsfield, South Gloucestershire, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as £1.00 + £0.30/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Park Road, BS16 1DT
- **Area:** Mangotsfield, South Gloucestershire, United Kingdom
- **Coordinates (latitude, longitude):** 51.48573, -2.55076

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** £1.00 + £0.30/kWh (from Open Charge Map)

## Site information

- **Operator:** GeniePoint
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at MFG Texaco Stapleton (GeniePoint)?

The listed price is £1.00 + £0.30/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at MFG Texaco Stapleton (GeniePoint)?

Up to 50 kW DC via Type 2, CHAdeMO, CCS.

### How many charging sockets does MFG Texaco Stapleton (GeniePoint) have?

1 charging socket: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.

### Who operates MFG Texaco Stapleton?

MFG Texaco Stapleton is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

### How long does a Tesla Model Y Long Range take to charge at MFG Texaco Stapleton (GeniePoint)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at MFG Texaco Stapleton (GeniePoint)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at MFG Texaco Stapleton (GeniePoint)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Mangotsfield](https://ampmap.co.uk/chargers/united-kingdom/south-gloucestershire/mangotsfield)
- [Cheapest charging in Mangotsfield](https://ampmap.co.uk/chargers/united-kingdom/south-gloucestershire/mangotsfield/cheapest)
- [GeniePoint chargers](https://ampmap.co.uk/networks/geniepoint)

## Chargers near this site

- [MFG Stapleton · MFG EV Power](https://ampmap.co.uk/charger/mfg-ev-power-mfg-stapleton-uk) - CCS 150 kW, CHAdeMO 50 kW · Park Road
- [Eastville Park · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-eastville-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Park Avenue
- [Morrisons Bristol Fishponds · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-bristol-fishponds-uk) - CCS 50 kW, CHAdeMO 50 kW · 690-718 Fishponds Road Fishponds
- [Pod Point Tesco Extra - Bristol Eastville](https://ampmap.co.uk/charger/pod-point-tesco-extra-bristol-eastville-2-uk) - Type 2 7 kW · Eastgate Road Eastville · From 44.4p/kWh
- [IONITY GmbH IONITY Bristol M32](https://ampmap.co.uk/charger/ionity-gmbh-ionity-bristol-m32-uk) - CCS 400 kW, CCS 350 kW · Eastgate Rd · From 83.3p/kWh
- [Bristol, UK - Eastgate · Tesla](https://ampmap.co.uk/charger/tesla-bristol-uk-eastgate-uk) - CCS 250 kW · Eastgate Retail Park, Eastgate Rd · From 28p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/the-geniepoint-network-mfg-texaco-stapleton-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 22 Feb 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.