GeniePoint · EV charging site
MFG Texaco Walnut
Barnsley Road, Wakefield, WF2 6BH
MFG Texaco Walnut is an EV charging site in Wakefield, City and Borough of Wakefield, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as £1.00 + £0.30/kWh. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Walnut Tree (Wakefield) (evyve), 40 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £1.00 + £0.30/kWh(from Open Charge Map, 25 Nov 2018)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at MFG Texaco Walnut (GeniePoint)?
The listed price is £1.00 + £0.30/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at MFG Texaco Walnut (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does MFG Texaco Walnut (GeniePoint) have?
1 charging socket: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates MFG Texaco Walnut?
MFG Texaco Walnut is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to MFG Texaco Walnut (GeniePoint)?
Walnut Tree (Wakefield) (evyve) is 40 yards away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at MFG Texaco Walnut (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at MFG Texaco Walnut (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at MFG Texaco Walnut (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Walnut Tree (Wakefield)
- Asda Wakefield
- Harratts Nissan Wakefield
- Best Western Hotel St Pierre
- Toby Carvery Wakefield
- Arnold Clark Wakefield
- Cheapest nearby
- Best Western Hotel St Pierre · 65p per kWh · 50 kW · 1.2 mi
- Fastest nearby
- Arnold Clark Wakefield · 150 kW · 1.4 mi