# Morrisons Aberystwyth · GeniePoint

Web page: https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-aberystwyth-uk

Morrisons Aberystwyth is an EV charging site in Aberystwyth, County of Ceredigion, run by GeniePoint. It has a single socket, with CCS and CHAdeMO at up to 50 kW.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Morrisons, SY23 1SP
- **Area:** Aberystwyth, County of Ceredigion, United Kingdom
- **Coordinates (latitude, longitude):** 52.40524, -4.06753

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 22 kW | 1 | Not listed |

- **Price:** AC: £0.50+£0.30p/kWh, £10 overstay charge after 95 mins; DC:: £1.00+£0.30/kWh, £10 overstay charge after 95 mins (from Open Charge Map)

## Site information

- **Operator:** GeniePoint
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)
- **Notes:** One device, two parking bays. Located in corner of car park nearest to roundabout at entrance.

## Common questions

### How much does it cost to charge at Morrisons Aberystwyth (GeniePoint)?

The listed price is AC: £0.50+£0.30p/kWh, £10 overstay charge after 95 mins; DC:: £1.00+£0.30/kWh, £10 overstay charge after 95 mins. Prices can change, so check the price at the charger before you start.

### How fast is charging at Morrisons Aberystwyth (GeniePoint)?

Up to 50 kW DC via Type 2, CCS, CHAdeMO.

### How many charging sockets does Morrisons Aberystwyth (GeniePoint) have?

1 charging socket: 1 × 22 kW Type 2, 1 × 50 kW CCS, 1 × 50 kW CHAdeMO.

### Who operates Morrisons Aberystwyth?

Morrisons Aberystwyth is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

### How long does a Tesla Model Y Long Range take to charge at Morrisons Aberystwyth (GeniePoint)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Aberystwyth (GeniePoint)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Morrisons Aberystwyth (GeniePoint)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Aberystwyth](https://ampmap.co.uk/chargers/united-kingdom/county-of-ceredigion/aberystwyth)
- [GeniePoint chargers](https://ampmap.co.uk/networks/geniepoint)

## Chargers near this site

- [Morrisons Aberystwyth Parc Y Llyn · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-aberystwyth-parc-y-llyn-uk) - CHAdeMO 50 kW, Type 2 50 kW · Llanbadarn Fawr
- [Aberystwyth, UK · Tesla](https://ampmap.co.uk/charger/tesla-supercharger-aberystwyth-uk) - CCS 250 kW · Ffordd Parc y Llyn · From 26p/kWh
- [Rhodfa Padarn · Dragon Charging](https://ampmap.co.uk/charger/dragon-charging-rhodfa-padarn-uk) - Type 2 22 kW · Canolfan Rheidol
- [Welsh Government · evcharge.online](https://ampmap.co.uk/charger/evcharge-online-welsh-government-uk) - Type 2 22 kW, Type 2 7 kW · Rhodfa Padarn
- [Anthony Motors Ltd · Alfapower](https://ampmap.co.uk/charger/alfapower-anthony-motors-ltd-uk) - CCS 22 kW, CHAdeMO 22 kW · Llanbadarn Road
- [Plascrug Leisure Centre, Aberystwyth · Silverstone Green Energy](https://ampmap.co.uk/charger/silverstone-green-energy-plascrug-leisure-centre-aberystwyth-uk) - Type 2 22 kW · Llanbadarn Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/the-geniepoint-network-morrisons-aberystwyth-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 16 Dec 2024).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
