# Morrisons Airdrie · GeniePoint

Web page: https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-airdrie-uk

Morrisons Airdrie is an EV charging site in Airdrie, North Lanarkshire, run by GeniePoint. It has a single socket, with CHAdeMO and Type 2 at up to 50 kW.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Gartlea Road, ML6 6EF
- **Area:** Airdrie, North Lanarkshire, United Kingdom
- **Coordinates (latitude, longitude):** 55.86524, -3.97615

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 50 kW | 1 | Not listed |
| Type 2 | 22 kW | 1 | Not listed |

- **Price:** £0.79/kWh. £10.00 overstay every 90 mins (from Open Charge Map)

## Site information

- **Operator:** GeniePoint
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at Morrisons Airdrie (GeniePoint)?

The listed price is £0.79/kWh. £10.00 overstay every 90 mins. Prices can change, so check the price at the charger before you start.

### How fast is charging at Morrisons Airdrie (GeniePoint)?

Up to 50 kW DC via CHAdeMO, Type 2.

### How many charging sockets does Morrisons Airdrie (GeniePoint) have?

1 charging socket: 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2, 1 × 50 kW Type 2.

### Who operates Morrisons Airdrie?

Morrisons Airdrie is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

### How long does a Tesla Model Y Long Range take to charge at Morrisons Airdrie (GeniePoint)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Airdrie (GeniePoint)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Morrisons Airdrie (GeniePoint)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Airdrie](https://ampmap.co.uk/chargers/united-kingdom/north-lanarkshire/airdrie)
- [GeniePoint chargers](https://ampmap.co.uk/networks/geniepoint)

## Chargers near this site

- [119B Hallcraig Street · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-119b-hallcraig-street-uk) - CCS 50 kW, CHAdeMO 50 kW · 119B Hallcraig Street
- [Airdrie Railway Station · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-airdrie-railway-station-uk) - Type 2 7 kW · Victoria Place
- [Colston SF Connect · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-colston-sf-connect-uk) - CCS 150 kW · 3 Carlisle Road
- [The Atrium Business Centre](https://ampmap.co.uk/charger/the-atrium-business-centre-uk) - Type 2 7 kW · North Caldeen Road
- [Starbucks Coatbridge - 0027 · FOR EV](https://ampmap.co.uk/charger/for-ev-starbucks-coatbridge-0027-uk) - CCS 160 kW · Starbucks Coatbridge, Coatbank Way · From 75p/kWh
- [Muiryhall St Car Park, Coatbridge · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-muiryhall-st-car-park-coatbridge-uk) - Type 2 7 kW · Muiryhall Street

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/the-geniepoint-network-morrisons-airdrie-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 7 Dec 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
