# Morrisons Aylesbury · GeniePoint

Web page: https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-aylesbury-uk

Morrisons Aylesbury is an EV charging site in Aylesbury, Buckinghamshire, run by GeniePoint. Its 4 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** WM Morrison Supermarkets PLC, HP20 2HX
- **Area:** Aylesbury, Buckinghamshire, United Kingdom
- **Coordinates (latitude, longitude):** 51.81445, -0.81664

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 22 kW | 1 | Not listed |

- **Price:** £0.79/kWh. £10.00 overstay every 90 mins (from Open Charge Map)

## Site information

- **Operator:** GeniePoint
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Morrisons Aylesbury (GeniePoint)?

The listed price is £0.79/kWh. £10.00 overstay every 90 mins. Prices can change, so check the price at the charger before you start.

### How fast is charging at Morrisons Aylesbury (GeniePoint)?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

### How many charging sockets does Morrisons Aylesbury (GeniePoint) have?

4 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2.

### Who operates Morrisons Aylesbury?

Morrisons Aylesbury is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

### How long does a Tesla Model Y Long Range take to charge at Morrisons Aylesbury (GeniePoint)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Aylesbury (GeniePoint)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Morrisons Aylesbury (GeniePoint)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Aylesbury](https://ampmap.co.uk/chargers/united-kingdom/buckinghamshire/aylesbury)
- [Cheapest charging in Aylesbury](https://ampmap.co.uk/chargers/united-kingdom/buckinghamshire/aylesbury/cheapest)
- [GeniePoint chargers](https://ampmap.co.uk/networks/geniepoint)

## Chargers near this site

- [Waterside North Car Park · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-waterside-north-car-park-aylesbury-uk) - Type 2 7 kW · Waterside North Car Park, 3 Exchange St · From 65p/kWh
- [Exchange Street Car Park · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-exchange-street-car-park-uk) - Type 2 7 kW · Exchange Street Car Park · From 65p/kWh
- [Coopers Yard Car park · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-coopers-yard-car-park-aylesbury-uk) - Type 2 7 kW · Coopers Yard Car park · From 65p/kWh
- [Buckinghamshire Council · BP Pulse](https://ampmap.co.uk/charger/charge-your-car-buckinghamshire-council-offices-uk) - Type 2 7 kW · Buckinghamshire Council, The Gateway, The Gat · From 65p/kWh
- [Pod Point Tesco Superstore - Aylesbury Tring Road](https://ampmap.co.uk/charger/pod-point-tesco-superstore-aylesbury-tring-road-2-uk) - Type 2 7 kW · Tring Road · From 44.4p/kWh
- [Walton Court Centre · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-walton-court-centre-uk) - CCS / CHAdeMO 50 kW, Type 2 4 kW · Walton Court Centre, Hannon Road · From 65p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/the-geniepoint-network-morrisons-aylesbury-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 4 Jul 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
