# Morrisons Bacup · GeniePoint

Web page: https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-bacup-uk

Morrisons Bacup is an EV charging site in Rossendale, Lancashire, run by GeniePoint. Its 3 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Lee Street, OL13 0AG
- **Area:** Rossendale, Lancashire, United Kingdom
- **Coordinates (latitude, longitude):** 53.70099, -2.19952

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 22 kW | 1 | Not listed |

- **Price:** Rapid ( £1 fee + 30p per kw ) AC is a 22kw Socket ( 50p fee + 30 per per Kw ) (from Open Charge Map)

## Site information

- **Operator:** GeniePoint
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required
- **Notes:** Geniepoint 50kw Rapid ( £1 fee + 30p per kw ) AC is a 22kw Socket ( 50p fee + 30 per per Kw ) https://www.cpsgenie.com/ds

## Common questions

### How much does it cost to charge at Morrisons Bacup (GeniePoint)?

The listed price is Rapid ( £1 fee + 30p per kw ) AC is a 22kw Socket ( 50p fee + 30 per per Kw ). Prices can change, so check the price at the charger before you start.

### How fast is charging at Morrisons Bacup (GeniePoint)?

Up to 50 kW DC via Type 2, CHAdeMO, CCS.

### How many charging sockets does Morrisons Bacup (GeniePoint) have?

3 charging sockets: 1 × 22 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.

### Who operates Morrisons Bacup?

Morrisons Bacup is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

### How long does a Tesla Model Y Long Range take to charge at Morrisons Bacup (GeniePoint)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Bacup (GeniePoint)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Morrisons Bacup (GeniePoint)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Rossendale](https://ampmap.co.uk/chargers/united-kingdom/lancashire/rossendale)
- [GeniePoint chargers](https://ampmap.co.uk/networks/geniepoint)

## Chargers near this site

- [Rossendale - Madens Children's Centre CP · Blink Charging](https://ampmap.co.uk/charger/blink-charging-rossendale-madens-children-s-centre-cp-uk) - CHAdeMO 50 kW, Type 2 50 kW · Rochdale Rd
- [King Street · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-king-street-uk) - Type 2 7 kW · King Street · From 65p/kWh
- [Rossendale - Futures Park CP · Blink Charging](https://ampmap.co.uk/charger/blink-charging-rossendale-futures-park-cp-uk) - CHAdeMO 50 kW, Type 2 50 kW · Business Centre/Futures Park

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/the-geniepoint-network-morrisons-bacup-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 4 Oct 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
