# Morrisons Bath · GeniePoint

Web page: https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-bath-uk

Morrisons Bath is an EV charging site in Bath, Bath and North East Somerset, run by GeniePoint. Its 3 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed, and the price is listed as £1 connection plus 30p per kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** London Road, BA1 6AE
- **Area:** Bath, Bath and North East Somerset, United Kingdom
- **Coordinates (latitude, longitude):** 51.39188, -2.35154

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 22 kW | 1 | Not listed |

- **Price:** £1 connection plus 30p per kWh. (from Open Charge Map)

## Site information

- **Operator:** GeniePoint
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Morrisons Bath (GeniePoint)?

The listed price is £1 connection plus 30p per kWh.. Prices can change, so check the price at the charger before you start.

### How fast is charging at Morrisons Bath (GeniePoint)?

Up to 50 kW DC via Type 2, CHAdeMO, CCS.

### How many charging sockets does Morrisons Bath (GeniePoint) have?

3 charging sockets: 1 × 22 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.

### Who operates Morrisons Bath?

Morrisons Bath is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

### How long does a Tesla Model Y Long Range take to charge at Morrisons Bath (GeniePoint)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Bath (GeniePoint)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Morrisons Bath (GeniePoint)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Bath](https://ampmap.co.uk/chargers/united-kingdom/bath-and-north-east-somerset/bath)
- [Cheapest charging in Bath](https://ampmap.co.uk/chargers/united-kingdom/bath-and-north-east-somerset/bath/cheapest)
- [GeniePoint chargers](https://ampmap.co.uk/networks/geniepoint)

## Chargers near this site

- [Revive\_BANES · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-revive-banes-4-uk) - Type 2 22 kW · St Saviours Road
- [EVC Bath Spa Hotel · Roam Charging](https://ampmap.co.uk/charger/roam-charging-evc-bath-spa-hotel-uk) - Type 2 22 kW · Sydney Road
- [Pod Point Hope House](https://ampmap.co.uk/charger/pod-point-hope-house-2-uk) - Type 2 7 kW · Lansdown Rd · Free to use
- [Pod Point The Podium, Car Park](https://ampmap.co.uk/charger/pod-point-the-podium-car-park-uk) - Type 2 7 kW · Northgate St The Podium · From 50.4p/kWh
- [Sutton Hotels Francis Hotel · ChargePoint](https://ampmap.co.uk/charger/chargepoint-sutton-hotels-francis-hotel-uk) - Type 2 22 kW · Francis Hotel, 6-12 Queen Square
- [Charlotte Street Car Park Hub · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-charlotte-street-car-park-hub-uk) - CCS 50 kW, CHAdeMO 50 kW · Charlotte Street

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/the-geniepoint-network-morrisons-bath-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 7 Oct 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
