GeniePoint · EV charging site
Morrisons Binley
Skipworth Road, Coventry, CV3 2XA
Morrisons Binley is an EV charging site at Skipworth Road in Coventry, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as 35p per kW. Amp Map lists 1 other charge point named Morrisons Binley in Coventry. 7 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Morrisons Binley (GeniePoint), 60 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- 35p per kW(from Open Charge Map, 4 Apr 2021)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Notes
- Geniepoint 50kW Rapid AC is a 22kW socket
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Morrisons Binley (GeniePoint)?
The listed price is 35p per kW. Prices can change, so check the price at the charger before you start.
How fast is charging at Morrisons Binley (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does Morrisons Binley (GeniePoint) have?
1 charging socket: 1 × 22 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Morrisons Binley?
Morrisons Binley is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Morrisons Binley (GeniePoint)?
Morrisons Binley (GeniePoint) is 60 yards away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Morrisons Binley (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Binley (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Morrisons Binley (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Morrisons Binley · 60 kW · 60 yd