GeniePoint · EV charging site
Morrisons Cambourne
Great Cambourne, Saint Ives, CB23 6EY
Morrisons Cambourne is an EV charging site in Saint Ives, Cambridgeshire, run by GeniePoint. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is EH - Extra Cambridge (GRIDSERVE), 4.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Morrisons Cambourne (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does Morrisons Cambourne (GeniePoint) have?
3 charging sockets: 1 × 22 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2.
Who operates Morrisons Cambourne?
Morrisons Cambourne is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Morrisons Cambourne (GeniePoint)?
EH - Extra Cambridge (GRIDSERVE) is 4.2 miles away in a straight line, with up to 400 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Morrisons Cambourne (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Cambourne (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Morrisons Cambourne (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- IONITY GmbH IONITY Cambridge · 89p per kWh · 350 kW · 4.2 mi
- Fastest nearby
- EH - Extra Cambridge · 400 kW · 4.2 mi