GeniePoint · EV charging site
Morrisons Cheadle
18 Sun Street, Longton, ST10 1EZ
Morrisons Cheadle is an EV charging site at 18 Sun Street, in Longton, Stoke-on-Trent, run by GeniePoint. Its 3 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed. Amp Map lists 1 other charge point named Morrisons Cheadle in Longton. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Morrisons Cheadle (GeniePoint), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Rapid: £1.00 fee then 30p per kWh. AC: 50p fee then 30p per kWh.(from Open Charge Map, 6 Oct 2020)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Notes
- £10.00 overstay fee after 95 mins, then £10.00 every subsequent 95 mins
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Morrisons Cheadle (GeniePoint)?
The listed price is Rapid: £1.00 fee then 30p per kWh. AC: 50p fee then 30p per kWh.. Prices can change, so check the price at the charger before you start.
How fast is charging at Morrisons Cheadle (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does Morrisons Cheadle (GeniePoint) have?
3 charging sockets: 1 × 22 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Morrisons Cheadle?
Morrisons Cheadle is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Morrisons Cheadle (GeniePoint)?
Morrisons Cheadle (GeniePoint) is 0.1 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Morrisons Cheadle (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Cheadle (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Morrisons Cheadle (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Morrisons Cheadle · 60 kW · 0.1 mi