GeniePoint · EV charging site
Morrisons Ebbw Vale
Beaufort Road, Ebbw Vale, NP23 5WS
Morrisons Ebbw Vale is an EV charging site in Ebbw Vale, Blaenau Gwent, run by GeniePoint. It has a single socket, with CCS and CHAdeMO at up to 60 kW, and the price is listed as £0.83/kWh. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Costa Brynmawr (InstaVolt Ltd), 2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.83/kWh(from Open Charge Map, 6 Feb 2025)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Morrisons Ebbw Vale (GeniePoint)?
The listed price is £0.83/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Morrisons Ebbw Vale (GeniePoint)?
Up to 60 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Morrisons Ebbw Vale (GeniePoint) have?
1 charging socket: 1 × 60 kW CCS, 1 × 60 kW CHAdeMO, 1 × 22 kW Type 2.
Who operates Morrisons Ebbw Vale?
Morrisons Ebbw Vale is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Morrisons Ebbw Vale (GeniePoint)?
Costa Brynmawr (InstaVolt Ltd) is 2 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Morrisons Ebbw Vale (GeniePoint)?
A typical 10–80% rapid charge takes about 58 min on the 60 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Ebbw Vale (GeniePoint)?
A typical 10–80% rapid charge takes about 43 min on the 60 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Morrisons Ebbw Vale (GeniePoint)?
A typical 10–80% rapid charge takes about 57 min on the 60 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Tesco Superstore - Ebbw Vale
- The Car Island
- Colliers' Row
- Boxworks, Ebbw Vale
- Glanhowy Primary School, Tredegar
- Pod Point Bevan Health and Wellbeing Centre
- Cheapest nearby
- Pod Point Bevan Health and Wellbeing Centre · 21.6p per kWh · 7 kW · 1.3 mi