GeniePoint · EV charging site
Morrisons Hawick
Morrisons Hawick, TD9 9NQ
Morrisons Hawick is an EV charging site in Hawick, The Scottish Borders, run by GeniePoint. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Teviotdale Leisure Centre, Hawick (Chargeplace Scotland), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Morrisons Hawick (GeniePoint)?
Up to 50 kW DC via CHAdeMO, Type 2.
How many charging sockets does Morrisons Hawick (GeniePoint) have?
3 charging sockets: 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2, 1 × 50 kW Type 2.
Who operates Morrisons Hawick?
Morrisons Hawick is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Morrisons Hawick (GeniePoint)?
Teviotdale Leisure Centre, Hawick (Chargeplace Scotland) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Morrisons Hawick (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Hawick (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Morrisons Hawick (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.