GeniePoint · EV charging site
Morrisons Hoddesdon
Amwell Street, Hoddesdon, EN118UD
Morrisons Hoddesdon is an EV charging site in Hoddesdon, Hertfordshire, run by GeniePoint. It has a single socket, with CCS and CHAdeMO at up to 50 kW. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Ware Road SF Connect (BP Pulse), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.35/kWh; £10.00 overstay fee after 95 mins, then £10.00 every subsequent 95 mins(from Open Charge Map, 4 Apr 2021)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Getting there
- In Morrison's Carpark Max stay 95mins
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Morrisons Hoddesdon (GeniePoint)?
The listed price is £0.35/kWh; £10.00 overstay fee after 95 mins, then £10.00 every subsequent 95 mins. Prices can change, so check the price at the charger before you start.
How fast is charging at Morrisons Hoddesdon (GeniePoint)?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Morrisons Hoddesdon (GeniePoint) have?
1 charging socket: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2.
Who operates Morrisons Hoddesdon?
Morrisons Hoddesdon is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Morrisons Hoddesdon (GeniePoint)?
Ware Road SF Connect (BP Pulse) is 0.2 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Morrisons Hoddesdon (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Hoddesdon (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Morrisons Hoddesdon (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Taverners Way North 1
- Ware Road SF Connect
- Basepoint Broxbourne
- Hertfordshire Golf Club
- Morgan Fire Protection
- Premier Inn Ware
- Cheapest nearby
- Basepoint Broxbourne · 59p per kWh · 25 kW · 0.6 mi
- Fastest nearby
- Ware Road SF Connect · 150 kW · 0.2 mi