# Morrisons Horndean · GeniePoint

Web page: https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-horndean-uk

Morrisons Horndean is an EV charging site in Waterlooville, Hampshire, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Lakesmere Road, PO8 9FB
- **Area:** Waterlooville, Hampshire, United Kingdom
- **Coordinates (latitude, longitude):** 50.90787, -1.00201

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** £1.00 + £0.30/kWh. £10.00 overstay fee after 95 mins, then £10.00 every subsequent 95 mins (from Open Charge Map)

## Site information

- **Operator:** GeniePoint
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Morrisons Horndean (GeniePoint)?

The listed price is £1.00 + £0.30/kWh. £10.00 overstay fee after 95 mins, then £10.00 every subsequent 95 mins. Prices can change, so check the price at the charger before you start.

### How fast is charging at Morrisons Horndean (GeniePoint)?

Up to 50 kW DC via Type 2, CHAdeMO, CCS.

### How many charging sockets does Morrisons Horndean (GeniePoint) have?

1 charging socket: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.

### Who operates Morrisons Horndean?

Morrisons Horndean is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

### How long does a Tesla Model Y Long Range take to charge at Morrisons Horndean (GeniePoint)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Horndean (GeniePoint)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Morrisons Horndean (GeniePoint)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Waterlooville](https://ampmap.co.uk/chargers/united-kingdom/hampshire/waterlooville)
- [GeniePoint chargers](https://ampmap.co.uk/networks/geniepoint)

## Chargers near this site

- [ICEE Office · Go Zero](https://ampmap.co.uk/charger/go-zero-icee-office-uk) - Type 2 7 kW · I C E E Managed Services Ltd
- [BeWorks Test Team](https://ampmap.co.uk/charger/beworks-test-team-uk) - Type 2 7 kW · Arnside Rd
- [Waterlooville Service Station · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-waterlooville-service-station-uk) - CCS 50 kW, CHAdeMO 50 kW · 1 Elettra Avenue
- [Shell Recharge Shell Whichers Gate](https://ampmap.co.uk/charger/shell-recharge-shell-whichers-gate-uk) - CCS 400 kW · Rowlands Castle · From 89p/kWh
- [Wellington Way Car Park · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-wellington-way-car-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Wellington Way
- [Yeomans Nissan · Nissan UK Dealer Network](https://ampmap.co.uk/charger/nissan-uk-dealer-network-yeomans-nissan-uk) - CHAdeMO 50 kW · Hambledon Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/the-geniepoint-network-morrisons-horndean-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 24 Aug 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
