GeniePoint · EV charging site
Morrisons Kings Lynn
Coburg Street, King's Lynn, PE30 1QB
Morrisons Kings Lynn is an EV charging site in King's Lynn, Norfolk (PE30 1QB), run by GeniePoint. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. Amp Map lists 1 other charge point named Morrisons Kings Lynn in King's Lynn. 11 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Morrisons Kings Lynn (GeniePoint), 90 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Morrisons Kings Lynn (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does Morrisons Kings Lynn (GeniePoint) have?
3 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2.
Who operates Morrisons Kings Lynn?
Morrisons Kings Lynn is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Morrisons Kings Lynn (GeniePoint)?
Morrisons Kings Lynn (GeniePoint) is 90 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Morrisons Kings Lynn (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Kings Lynn (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Morrisons Kings Lynn (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Morrisons Kings Lynn
- College of West Anglia (King's Lynn Campus)
- St James Car Park
- Austin Street
- Pod Point The Duke's Head Hotel
- Chapel Street Car Park
- Cheapest nearby
- Austin Street · 65p per kWh · 7 kW · 0.3 mi