GeniePoint · EV charging site
Morrisons Leigh Sports Village
Leigh Sports Village, WN7 4JY
Morrisons Leigh Sports Village is an EV charging site in Leigh, Borough of Wigan, run by GeniePoint. Its 3 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed. 9 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is IMO Leigh (Be.EV), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Rapid (£1 fee + 30p per kWh) AC is a 22kW Socket (50p fee + 30p per per kWh)(from Open Charge Map, 6 Oct 2020)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Morrisons Leigh Sports Village (GeniePoint)?
The listed price is Rapid (£1 fee + 30p per kWh) AC is a 22kW Socket (50p fee + 30p per per kWh). Prices can change, so check the price at the charger before you start.
How fast is charging at Morrisons Leigh Sports Village (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does Morrisons Leigh Sports Village (GeniePoint) have?
3 charging sockets: 1 × 22 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Morrisons Leigh Sports Village?
Morrisons Leigh Sports Village is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Morrisons Leigh Sports Village (GeniePoint)?
IMO Leigh (Be.EV) is 0.5 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Morrisons Leigh Sports Village (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Leigh Sports Village (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Morrisons Leigh Sports Village (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- IMO Leigh
- Parsonage Retail Park, Leigh
- Leigh Town Hall
- Doctors Nook Car Park
- Spinning Gate Pay & Display
- Doctors Nook Pay and Display
- Cheapest nearby
- Leigh Town Hall · 59p per kWh · 50 kW · 0.7 mi
- Fastest nearby
- IMO Leigh · 150 kW · 0.5 mi