# Morrisons Leominster · GeniePoint

Web page: https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-leominster-2-uk

Morrisons Leominster is an EV charging site in Hereford, Herefordshire, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as £0.35/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Howard Cottages, HR6 8RW
- **Area:** Hereford, Herefordshire, United Kingdom
- **Coordinates (latitude, longitude):** 52.22336, -2.75755
- **Getting there:** £10.00 overstay fee after 90 mins, then £10.00 every subsequent 90 mins

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 22 kW | 1 | Not listed |

- **Price:** £0.35/kWh (from Open Charge Map)

## Site information

- **Operator:** GeniePoint
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at Morrisons Leominster (GeniePoint)?

The listed price is £0.35/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Morrisons Leominster (GeniePoint)?

Up to 50 kW DC via Type 2, CHAdeMO, CCS.

### How many charging sockets does Morrisons Leominster (GeniePoint) have?

1 charging socket: 1 × 22 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.

### Who operates Morrisons Leominster?

Morrisons Leominster is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

### How long does a Tesla Model Y Long Range take to charge at Morrisons Leominster (GeniePoint)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Leominster (GeniePoint)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Morrisons Leominster (GeniePoint)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Hereford](https://ampmap.co.uk/chargers/united-kingdom/herefordshire/hereford)
- [GeniePoint chargers](https://ampmap.co.uk/networks/geniepoint)

## Chargers near this site

- [Morrisons Leominster · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-leominster-uk) - Type 2 60 kW, CHAdeMO 50 kW · Barons Cross Road
- [Broad Street Car Park · POGO](https://ampmap.co.uk/charger/instavolt-ltd-broad-street-car-park-uk) - CCS 50 kW, CHAdeMO 50 kW · 38 Arkwright Close · From 56p/kWh
- [Etnam Street Car Park · Wenea](https://ampmap.co.uk/charger/wenea-etnam-street-car-park-uk) - Type 2 7 kW · Etnam Street
- [OK Diner · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-ok-diner-uk) - CCS 50 kW, CHAdeMO 50 kW · A49

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/the-geniepoint-network-morrisons-leominster-2-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 5 Aug 2025).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
