# Morrisons Malton · GeniePoint

Web page: https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-malton-uk

Morrisons Malton is an EV charging site in Malton, North Yorkshire, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Castlegate, YO17 7DT
- **Area:** Malton, North Yorkshire, United Kingdom
- **Coordinates (latitude, longitude):** 54.13361, -0.79539

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 22 kW | 1 | Not listed |

- **Price:** £0.35/kWh; other tariffs available (from Open Charge Map)

## Site information

- **Operator:** GeniePoint
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Morrisons Malton (GeniePoint)?

The listed price is £0.35/kWh; other tariffs available. Prices can change, so check the price at the charger before you start.

### How fast is charging at Morrisons Malton (GeniePoint)?

Up to 50 kW DC via CHAdeMO, Type 2, CCS.

### How many charging sockets does Morrisons Malton (GeniePoint) have?

1 charging socket: 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2, 1 × 50 kW CCS.

### Who operates Morrisons Malton?

Morrisons Malton is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

### How long does a Tesla Model Y Long Range take to charge at Morrisons Malton (GeniePoint)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Malton (GeniePoint)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Morrisons Malton (GeniePoint)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Malton](https://ampmap.co.uk/chargers/united-kingdom/north-yorkshire/malton)
- [GeniePoint chargers](https://ampmap.co.uk/networks/geniepoint)

## Chargers near this site

- [Morrisons Malton · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-malton-2-uk) - Type 2 60 kW, CHAdeMO 50 kW · Castlegate
- [Water Lane Car Park · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-water-lane-car-park-uk) - CCS / CHAdeMO / Type 2 50 kW · Water Lane Car Park, Railway Street · From 89p/kWh
- [Norton-on-Derwent SF Connect · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-norton-on-derwent-sf-connect-uk) - CCS 150 kW · Welham Road
- [25 Saint Nicholas Street · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-25-saint-nicholas-street-uk) - CCS / CHAdeMO / Type 2 50 kW · 25 Saint Nicholas Street · From 89p/kWh
- [JB Motors](https://ampmap.co.uk/charger/jb-motors-uk) - Type 2 7 kW · Garage
- [Wentworth Street car park](https://ampmap.co.uk/charger/wentworth-street-car-park-uk) - Type 2 22 kW · 2 Wentworth St

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/the-geniepoint-network-morrisons-malton-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 28 Aug 2021).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
