GeniePoint · EV charging site
Morrisons Meadowhead
84-130 Meadowhead, Nether Edge, S8 7UE
Morrisons Meadowhead is an EV charging site in Nether Edge, Sheffield, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as £1.00 + £0.30/kWh. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is HU - St James Retail Park (GRIDSERVE), 0.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £1.00 + £0.30/kWh(from Open Charge Map, 26 Apr 2019)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Morrisons Meadowhead (GeniePoint)?
The listed price is £1.00 + £0.30/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Morrisons Meadowhead (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does Morrisons Meadowhead (GeniePoint) have?
1 charging socket: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Morrisons Meadowhead?
Morrisons Meadowhead is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Morrisons Meadowhead (GeniePoint)?
HU - St James Retail Park (GRIDSERVE) is 0.8 miles away in a straight line, with up to 400 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Morrisons Meadowhead (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Meadowhead (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Morrisons Meadowhead (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- HU - St James Retail Park
- Pod Point Tesco Superstore - Sheffield Abbeydale
- Dunelm Mill Sheffield Woodseats
- Albert Road Car Park, Sheffield 1
- Ponsford Car Park
- Pod Point Ecclesall Primary School
- Cheapest nearby
- Pod Point Tesco Superstore - Sheffield Abbeydale · 44.4p per kWh · 7 kW · 0.9 mi
- Fastest nearby
- HU - St James Retail Park · 400 kW · 0.8 mi