# Morrisons Neath · GeniePoint

Web page: https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-neath-uk

Morrisons Neath is an EV charging site in Neath, Neath Port Talbot, run by GeniePoint. Its 3 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed, and the price is listed as Rapid: £1.00 fee then 30p per kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Angel St, SA11 3LN
- **Area:** Neath, Neath Port Talbot, United Kingdom
- **Coordinates (latitude, longitude):** 51.66497, -3.80566

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 22 kW | 1 | Not listed |

- **Price:** Rapid: £1.00 fee then 30p per kWh. (from Open Charge Map)

## Site information

- **Operator:** GeniePoint
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required
- **Notes:** £10.00 overstay fee after 95 mins

## Common questions

### How much does it cost to charge at Morrisons Neath (GeniePoint)?

The listed price is Rapid: £1.00 fee then 30p per kWh.. Prices can change, so check the price at the charger before you start.

### How fast is charging at Morrisons Neath (GeniePoint)?

Up to 50 kW DC via Type 2, CHAdeMO, CCS.

### How many charging sockets does Morrisons Neath (GeniePoint) have?

3 charging sockets: 1 × 22 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.

### Who operates Morrisons Neath?

Morrisons Neath is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

### How long does a Tesla Model Y Long Range take to charge at Morrisons Neath (GeniePoint)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Neath (GeniePoint)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Morrisons Neath (GeniePoint)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Neath](https://ampmap.co.uk/chargers/united-kingdom/neath-port-talbot/neath)
- [GeniePoint chargers](https://ampmap.co.uk/networks/geniepoint)

## Chargers near this site

- [Pod Point Tesco Superstore - Neath](https://ampmap.co.uk/charger/pod-point-tesco-superstore-neath-uk) - Type 2 7 kW · Neath Abbey Road · From 44.4p/kWh
- [Trade Centre UK](https://ampmap.co.uk/charger/trade-centre-uk-2-uk) - Type 2 22 kW · Trade Centre Wales
- [M and B Llandarcy Neath · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-m-and-b-llandarcy-neath-uk) - CCS 50 kW, CHAdeMO 50 kW · M and B Llandarcy Neath · From 89p/kWh
- [Brunel Way](https://ampmap.co.uk/charger/brunel-way-uk) - Type 2 7 kW
- [Earlswood Golf Course](https://ampmap.co.uk/charger/earlswood-golf-course-uk) - Type 2 7 kW · Glamorgan Green
- [Swansea Bay Golf Club](https://ampmap.co.uk/charger/swansea-bay-golf-club-uk) - Type 2 7 kW · West Glamorgan

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/the-geniepoint-network-morrisons-neath-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 7 Oct 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
