# Morrisons Seaford · GeniePoint

Web page: https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-seaford-uk

Morrisons Seaford is an EV charging site in Seaford, East Sussex, run by GeniePoint. Its 2 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Dane Road, BN25 1DL
- **Area:** Seaford, East Sussex, United Kingdom
- **Coordinates (latitude, longitude):** 50.77159, 0.09928
- **Getting there:** £10.00 overstay fee after 95 mins, then £10.00 every subsequent 95 mins

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 22 kW | 1 | Not listed |

- **Price:** £0.88 / kWh. £10.00 overstay fee after 90 mins, then £10.00 every subsequent 90 mins (from Open Charge Map)

## Site information

- **Operator:** GeniePoint
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required
- **Notes:** GeniePoint 50kW Rapid AC is a 22kw Socket Geniepoint Network https://www.cpsgenie.com/ds

## Common questions

### How much does it cost to charge at Morrisons Seaford (GeniePoint)?

The listed price is £0.88 / kWh. £10.00 overstay fee after 90 mins, then £10.00 every subsequent 90 mins. Prices can change, so check the price at the charger before you start.

### How fast is charging at Morrisons Seaford (GeniePoint)?

Up to 50 kW DC via CHAdeMO, CCS, Type 2.

### How many charging sockets does Morrisons Seaford (GeniePoint) have?

2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 22 kW Type 2.

### Who operates Morrisons Seaford?

Morrisons Seaford is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

### How long does a Tesla Model Y Long Range take to charge at Morrisons Seaford (GeniePoint)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Seaford (GeniePoint)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Morrisons Seaford (GeniePoint)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Seaford](https://ampmap.co.uk/chargers/united-kingdom/east-sussex/seaford)
- [GeniePoint chargers](https://ampmap.co.uk/networks/geniepoint)

## Chargers near this site

- [Pod Point BEC - Rathfinny Wine Estate](https://ampmap.co.uk/charger/pod-point-bec-rathfinny-wine-estate-uk) - Type 2 7 kW · Rathfinny · From 33.6p/kWh
- [Pod Point South Downs Seven Sisters](https://ampmap.co.uk/charger/pod-point-south-downs-seven-sisters-uk) - Type 2 7 kW · Seven Sisters Country Park Exceat · From 60p/kWh
- [Pod Point Safford Park](https://ampmap.co.uk/charger/pod-point-safford-park-2-uk) - Type 2 7 kW · Valentine House, 1 Parker Drive Newhaven · From 27.6p/kWh
- [Newhaven Town Centre Car Park · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-newhaven-town-centre-car-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Town Centre Car Park

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/the-geniepoint-network-morrisons-seaford-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 10 May 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
