GeniePoint · EV charging site
Morrisons St Albans
244 Hatfield Road, St Albans, AL1 4SU
Morrisons St Albans is an EV charging site in St Albans, Hertfordshire, run by GeniePoint. Its 2 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Adelaide Street (EB Charging), 1.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £1.00 + £0.30 / kWh. £10.00 overstay fee after 95 mins, then £10.00 every subsequent 95 mins(from Open Charge Map, 9 Feb 2020)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Morrisons St Albans (GeniePoint)?
The listed price is £1.00 + £0.30 / kWh. £10.00 overstay fee after 95 mins, then £10.00 every subsequent 95 mins. Prices can change, so check the price at the charger before you start.
How fast is charging at Morrisons St Albans (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does Morrisons St Albans (GeniePoint) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Morrisons St Albans?
Morrisons St Albans is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Morrisons St Albans (GeniePoint)?
Adelaide Street (EB Charging) is 1.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Morrisons St Albans (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons St Albans (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Morrisons St Albans (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Keyfield Terrace Car Park
- The Maltings Shopping Centre
- Adelaide Street
- London Road Car Park
- Griffiths Way
- Pod Point Bishops House
- Cheapest nearby
- Pod Point Bishops House · Free · 7 kW · 1.4 mi
- Fastest nearby
- Griffiths Way · 300 kW · 1.3 mi