# Morrisons Sunderland Doxford Park · GeniePoint

Web page: https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-sunderland-doxford-park-uk

Morrisons Sunderland Doxford Park is an EV charging site in Houghton-Le-Spring, Sunderland, run by GeniePoint. Its 3 sockets reach up to 60 kW, with Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Morrisons Sunderland Doxford P, SR3 2NE
- **Area:** Houghton-Le-Spring, Sunderland, United Kingdom
- **Coordinates (latitude, longitude):** 54.86695, -1.41470

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 60 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 22 kW | 1 | Not listed |

## Site information

- **Operator:** GeniePoint
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How fast is charging at Morrisons Sunderland Doxford Park (GeniePoint)?

Up to 60 kW DC via Type 2, CHAdeMO.

### How many charging sockets does Morrisons Sunderland Doxford Park (GeniePoint) have?

3 charging sockets: 1 × 60 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2.

### Who operates Morrisons Sunderland Doxford Park?

Morrisons Sunderland Doxford Park is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

### How long does a Tesla Model Y Long Range take to charge at Morrisons Sunderland Doxford Park (GeniePoint)?

A typical 10–80% rapid charge takes about 58 min on the 60 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Sunderland Doxford Park (GeniePoint)?

A typical 10–80% rapid charge takes about 43 min on the 60 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Morrisons Sunderland Doxford Park (GeniePoint)?

A typical 10–80% rapid charge takes about 57 min on the 60 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Houghton-Le-Spring](https://ampmap.co.uk/chargers/united-kingdom/sunderland/houghton-le-spring)
- [GeniePoint chargers](https://ampmap.co.uk/networks/geniepoint)

## Chargers near this site

- [Morrisons Sunderland · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-sunderland-uk) - CCS 50 kW, CHAdeMO 50 kW · William Doxford Centre
- [The Conishead Centre · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-the-conishead-centre-uk) - Silksworth Terrace
- [Oak Tree Farm (Sunderland) · evyve](https://ampmap.co.uk/charger/evyve-oak-tree-farm-sunderland-uk) - CCS 150 kW · Camberwell Way · From 85p/kWh
- [Aldenham Road 1, Sunderland · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-aldenham-road-1-sunderland-uk) - Type 2 7 kW · 65
- [Silksworth Community Pool Tennis and Wellness Centre · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-silksworth-community-pool-tennis-and-wellness-centre-uk) - BS1363 3 Pin 13 Amp 3 kW · Silksworth Community Pool Tennis and Wellness Centre
- [Akela House · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-akela-house-uk) - Type 2 · 2 Emperor House

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/the-geniepoint-network-morrisons-sunderland-doxford-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 7 Dec 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
