# Morrisons Watford · GeniePoint

Web page: https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-watford-uk

Morrisons Watford is an EV charging site in Watford, Hertfordshire, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as £1.80 + £0.30/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Ascot Road, WD18 8AA
- **Area:** Watford, Hertfordshire, United Kingdom
- **Coordinates (latitude, longitude):** 51.64789, -0.42261

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** £1.80 + £0.30/kWh (from Open Charge Map)

## Site information

- **Operator:** GeniePoint
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Morrisons Watford (GeniePoint)?

The listed price is £1.80 + £0.30/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Morrisons Watford (GeniePoint)?

Up to 50 kW DC via CHAdeMO, Type 2, CCS.

### How many charging sockets does Morrisons Watford (GeniePoint) have?

1 charging socket: 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 1 × 50 kW CCS.

### Who operates Morrisons Watford?

Morrisons Watford is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

### How long does a Tesla Model Y Long Range take to charge at Morrisons Watford (GeniePoint)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Watford (GeniePoint)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Morrisons Watford (GeniePoint)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Watford](https://ampmap.co.uk/chargers/united-kingdom/hertfordshire/watford)
- [GeniePoint chargers](https://ampmap.co.uk/networks/geniepoint)

## Chargers near this site

- [Watford Business Park](https://ampmap.co.uk/charger/watford-business-park-uk) - Type 2 7 kW · Greenhill Crescent
- [Pod Point Chime Housing - Dapple Court](https://ampmap.co.uk/charger/pod-point-dapple-court-uk) - Type 2 7 kW, Type 2 3 kW · 300 Croxley View · From 57.6p/kWh
- [Caxton Way Exit, Watford · Blink Charging](https://ampmap.co.uk/charger/blink-charging-caxton-way-exit-watford-uk) - Type 2 7 kW · Caxton Road
- [Croxley Business Park Building 1 · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-croxley-business-park-building-1-uk) - Type 2 22 kW · Croxley Business Park Building 1
- [Caxton Way Entrance, Watford · Blink Charging](https://ampmap.co.uk/charger/blink-charging-caxton-way-entrance-watford-uk) - Type 2 7 kW · Caxton Road
- [Belgrave Avenue · Blink Charging](https://ampmap.co.uk/charger/blink-charging-belgrave-avenue-uk) - Type 2 7 kW · Belgrave Avenue

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/the-geniepoint-network-morrisons-watford-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 20 May 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
