GeniePoint · EV charging site
Morrisons Weybridge
15 Monument Hill, Weybridge, KT13 8RT
Morrisons Weybridge is an EV charging site in Weybridge, Surrey, run by GeniePoint. Its 3 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed, and the price is listed as Rapid £1.00 fee then £0.30p per Kw. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Bannatyne Health Club & Spa (InstaVolt Ltd), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Rapid £1.00 fee then £0.30p per Kw(from Open Charge Map, 7 Oct 2020)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Morrisons Weybridge (GeniePoint)?
The listed price is Rapid £1.00 fee then £0.30p per Kw. Prices can change, so check the price at the charger before you start.
How fast is charging at Morrisons Weybridge (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does Morrisons Weybridge (GeniePoint) have?
3 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Morrisons Weybridge?
Morrisons Weybridge is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Morrisons Weybridge (GeniePoint)?
Bannatyne Health Club & Spa (InstaVolt Ltd) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Morrisons Weybridge (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Weybridge (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Morrisons Weybridge (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- EBC Churchfield Road Car Park
- EVC Oatlands Park Hotel
- Bannatyne Health Club & Spa
- Weybridge Business Park
- Mercedes Benz World
- Brooklands Hotel
- Cheapest nearby
- Brooklands Hotel · 65p per kWh · 50 kW · 1.5 mi