GeniePoint · EV charging site
Morrisons Whitley Bay
Wm Morrison Supermarkets PLC, Whitley Bay, NE25 8HN
Morrisons Whitley Bay is an EV charging site in Whitley Bay, North Tyneside, run by GeniePoint. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Whitley Bay (Fastned), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Morrisons Whitley Bay (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does Morrisons Whitley Bay (GeniePoint) have?
3 charging sockets: 1 × 22 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2.
Who operates Morrisons Whitley Bay?
Morrisons Whitley Bay is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Morrisons Whitley Bay (GeniePoint)?
Whitley Bay (Fastned) is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Morrisons Whitley Bay (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Whitley Bay (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Morrisons Whitley Bay (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Oaktree Lodge
- Whitley Bay
- Grand Parade
- North East Garages
- North Tyneside General Hospital
- Tynemouth, Beaconsfield 1
- Cheapest nearby
- Whitley Bay · 79p per kWh · 50 kW · 0.7 mi