GeniePoint · EV charging site
Museum Car Park
West Lane, Keighley, BD22 8DS
Museum Car Park is an EV charging site in Keighley, Bradford, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as Free to use until October 2021. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Morrisons Keighley (GeniePoint), 3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free to use until October 2021(from Open Charge Map, 28 Jul 2021)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Getting there
- Over Stay £10 every subsequent 75 mins. Com
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Museum Car Park (GeniePoint)?
The listed price is Free to use until October 2021. Prices can change, so check the price at the charger before you start.
How fast is charging at Museum Car Park (GeniePoint)?
Up to 50 kW DC via CHAdeMO, CCS, Type 2.
How many charging sockets does Museum Car Park (GeniePoint) have?
1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 22 kW Type 2.
Who operates Museum Car Park?
Museum Car Park is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Museum Car Park (GeniePoint)?
Morrisons Keighley (GeniePoint) is 3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Museum Car Park (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Museum Car Park (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Museum Car Park (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.