GeniePoint · EV charging site
NATS Whiteley
Parkway, Hedge End, PO15 7FL
NATS Whiteley is an EV charging site in Hedge End, Hampshire, run by GeniePoint. Its 6 sockets reach up to 22 kW, with Type 2 at the top speed. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is The Village Inn (BP Pulse), 1.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Customers only
- Price
- £1.00 for the first 60 minutes then £0.02 / min(from Open Charge Map, 2 Nov 2018)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at NATS Whiteley (GeniePoint)?
The listed price is £1.00 for the first 60 minutes then £0.02 / min. Prices can change, so check the price at the charger before you start.
How fast is charging at NATS Whiteley (GeniePoint)?
Up to 22 kW AC via Type 2.
How many charging sockets does NATS Whiteley (GeniePoint) have?
6 charging sockets: 4 × 7 kW Type 2, 2 × 22 kW Type 2.
Who operates NATS Whiteley?
NATS Whiteley is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Can anyone charge at NATS Whiteley (GeniePoint)?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to NATS Whiteley (GeniePoint)?
The Village Inn (BP Pulse) is 1.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at NATS Whiteley (GeniePoint)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at NATS Whiteley (GeniePoint)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at NATS Whiteley (GeniePoint)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Fusion 3 Car Parks (For tenants use only)
- Spaces Whiteley
- Pod Point Whiteley Shopping Centre, East car park (Whiteley Co-Own (USS Ltd&Whiteley Shop Ctr UT))
- The Village Inn
- Holiday Inn Fareham - Solent
- Shell Recharge Shell Titchfield
- Cheapest nearby
- Pod Point Fusion 3 Car Parks (For tenants use only) · 25.2p per kWh · 7 kW · 0.2 mi
- Fastest nearby
- Shell Recharge Shell Titchfield · 300 kW · 1.9 mi