# New Street Car Park · GeniePoint

Web page: https://ampmap.co.uk/charger/the-geniepoint-network-new-street-car-park-uk

New Street Car Park is an EV charging site in Huddersfield, Kirklees, run by GeniePoint. Its 3 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Area:** Huddersfield, Kirklees, United Kingdom
- **Coordinates (latitude, longitude):** 53.62362, -1.87776
- **Getting there:** £10 overstay fee after 75 mins, then £10 every subsequent 75 mins.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 22 kW | 1 | Not listed |

- **Price:** completely free to use until 29th October 2021. (from Open Charge Map)

## Site information

- **Operator:** GeniePoint
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required
- **Notes:** Engie rapid charger, 50kW DC, AC is a 22kW Socket. One bay for general use, one bay for taxis. Both Free to charge. Please register at : ev.engie.co.uk

## Common questions

### How much does it cost to charge at New Street Car Park (GeniePoint)?

The listed price is completely free to use until 29th October 2021.. Prices can change, so check the price at the charger before you start.

### How fast is charging at New Street Car Park (GeniePoint)?

Up to 50 kW DC via Type 2, CHAdeMO, CCS.

### How many charging sockets does New Street Car Park (GeniePoint) have?

3 charging sockets: 1 × 22 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.

### Who operates New Street Car Park?

New Street Car Park is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

### How long does a Tesla Model Y Long Range take to charge at New Street Car Park (GeniePoint)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at New Street Car Park (GeniePoint)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at New Street Car Park (GeniePoint)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Huddersfield](https://ampmap.co.uk/chargers/united-kingdom/kirklees/huddersfield)
- [GeniePoint chargers](https://ampmap.co.uk/networks/geniepoint)

## Chargers near this site

- [Tyas Cottage · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-tyas-cottage-uk) - Type 2 7 kW · Tyas Lane
- [Foxstone Edge Farm · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-foxstone-edge-farm-uk) - Type 2 7 kW · Sledgate Lane
- [EVC Pennine Manor Hotel · Roam Charging](https://ampmap.co.uk/charger/roam-charging-evc-pennine-manor-hotel-uk) - Type 2 22 kW · Nettleton Hill Road
- [Laneside Farm B&B · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-laneside-farm-b-and-b-uk) - Type 2 7 kW · Laneside Farm
- [Morrisons Holmfirth · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-holmfirth-uk) - CHAdeMO 50 kW, Type 2 50 kW · Meltham
- [The Old Golf House Hotel · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-the-old-golf-house-hotel-uk) - Type 2 7 kW · New Hey Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/the-geniepoint-network-new-street-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 4 Oct 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
