GeniePoint · EV charging site
Newquay Airport
St. Mawgan, Newquay, TR8 4RQ
Newquay Airport is an EV charging site in Newquay, Cornwall, run by GeniePoint. Its 4 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Albany Road Car Park (POGO), 3.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £1.00 + £0.30/kWh; £10.00 overstay after 65 mins,£0.50 + £0.30/kWh(from Open Charge Map, 30 Dec 2020)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Getting there
- Main Car park
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Newquay Airport (GeniePoint)?
The listed price is £1.00 + £0.30/kWh; £10.00 overstay after 65 mins,£0.50 + £0.30/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Newquay Airport (GeniePoint)?
Up to 50 kW DC via CHAdeMO, Type 2, CCS.
How many charging sockets does Newquay Airport (GeniePoint) have?
4 charging sockets: 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 1 × 50 kW CCS, 4 × 22 kW Type 2.
Who operates Newquay Airport?
Newquay Airport is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Newquay Airport (GeniePoint)?
Albany Road Car Park (POGO) is 3.9 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Newquay Airport (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Newquay Airport (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Newquay Airport (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Newquay Cornwall Airport
- The Hangar
- Pod Point Sun Haven Holiday Park
- Pod Point Merlin Farm Guests only
- Watergate Bay Hotel
- Watergate Bay Hotel
- Cheapest nearby
- Pod Point Merlin Farm Guests only · Free · 7 kW · 1.6 mi