GeniePoint · EV charging site
Oracle, Building 510
510 Oracle Parkway, Reading, RG6 1PT
Oracle, Building 510 is an EV charging site in Reading, run by GeniePoint. All 4 of its sockets are 7 kW Type 2, and the price is listed as £0.40 + £0.13/kWh. 11 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Sonning Cutting SF Connect (BP Pulse), 0.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Customers only
- Price
- £0.40 + £0.13/kWh(from Open Charge Map, 2 Nov 2018)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Oracle, Building 510 (GeniePoint)?
The listed price is £0.40 + £0.13/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Oracle, Building 510 (GeniePoint)?
Up to 7 kW AC via Type 2.
How many charging sockets does Oracle, Building 510 (GeniePoint) have?
4 charging sockets: 4 × 7 kW Type 2.
Who operates Oracle, Building 510?
Oracle, Building 510 is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Can anyone charge at Oracle, Building 510 (GeniePoint)?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to Oracle, Building 510 (GeniePoint)?
Sonning Cutting SF Connect (BP Pulse) is 0.8 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Oracle, Building 510 (GeniePoint)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Oracle, Building 510 (GeniePoint)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Oracle, Building 510 (GeniePoint)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.