GeniePoint · EV charging site
Pavillion car park
Quay Road, Ryde, PO33 2HH
Pavillion car park is an EV charging site in Ryde, Isle of Wight, run by GeniePoint. Both of its sockets are 7 kW Type 2, and the price is listed as £0.50 + £0.30/kWh. 5 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Quay Road Car Park (Be.EV), 10 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.50 + £0.30/kWh(from Open Charge Map, 26 Apr 2019)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Getting there
- Pavillion car park next to Hoverport
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Pavillion car park (GeniePoint)?
The listed price is £0.50 + £0.30/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Pavillion car park (GeniePoint)?
Up to 7 kW AC via Type 2.
How many charging sockets does Pavillion car park (GeniePoint) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Pavillion car park?
Pavillion car park is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest charger with 50 kW or more to Pavillion car park (GeniePoint)?
Quay Road Car Park (Be.EV) is 10 yards away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Pavillion car park (GeniePoint)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pavillion car park (GeniePoint)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pavillion car park (GeniePoint)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Quay Road Car Park
- St Thomas Street Car Park
- Wightlink
- Milligan Road Ryde
- Youngwoods Way
- Staddlestones Nissan
- Cheapest nearby
- Quay Road Car Park · 59p per kWh · 75 kW · 10 yd
- Fastest nearby
- St Thomas Street Car Park · 120 kW · 0.2 mi