GeniePoint · EV charging site
Plymouth Railway Station
140 North Road East, Plymouth, PL4 6AB
Plymouth Railway Station is an EV charging site in Plymouth, run by GeniePoint. Both of its sockets are 22 kW Type 2. 43 other charging sites are listed within a mile, and the nearest site with 50 kW or more is UK_PL_WHIMPLE_01 (Wenea), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Price
- Free. Parking fees apply.(from Open Charge Map, 2 Nov 2018)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Notes
- GE Industrial Durastation charger FirstGroup scheme
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Plymouth Railway Station (GeniePoint)?
The listed price is Free. Parking fees apply.. Prices can change, so check the price at the charger before you start.
How fast is charging at Plymouth Railway Station (GeniePoint)?
Up to 22 kW AC via Type 2.
How many charging sockets does Plymouth Railway Station (GeniePoint) have?
2 charging sockets: 2 × 22 kW Type 2.
Who operates Plymouth Railway Station?
Plymouth Railway Station is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest charger with 50 kW or more to Plymouth Railway Station (GeniePoint)?
UK_PL_WHIMPLE_01 (Wenea) is 0.6 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Plymouth Railway Station (GeniePoint)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Plymouth Railway Station (GeniePoint)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Plymouth Railway Station (GeniePoint)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Glen Park Avenue 1
- North Hill Car Park
- Drake Circus Leisure Complex
- Pod Point Mutley Plain
- Pod Point Regent Street (Public Car Park)
- Pod Point Drake Circus (Drake Circus Centre Ltd)
- Cheapest nearby
- Pod Point Drake Circus (Drake Circus Centre Ltd) · 49.2p per kWh · 7 kW · 0.5 mi