GeniePoint · EV charging site
Premier Inn
Centurion Way, Tamworth, B77 5PN
Premier Inn is an EV charging site in Tamworth, Staffordshire, run by GeniePoint. It has a single socket, with CCS at up to 60 kW. 14 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is MOT4400304 (Moto Hospitality), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Premier Inn (GeniePoint)?
Up to 60 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Premier Inn (GeniePoint) have?
1 charging socket: 1 × 60 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2.
Who operates Premier Inn?
Premier Inn is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Premier Inn (GeniePoint)?
MOT4400304 (Moto Hospitality) is 0.3 miles away in a straight line, with up to 400 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Premier Inn (GeniePoint)?
A typical 10–80% rapid charge takes about 58 min on the 60 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Premier Inn (GeniePoint)?
A typical 10–80% rapid charge takes about 43 min on the 60 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Premier Inn (GeniePoint)?
A typical 10–80% rapid charge takes about 57 min on the 60 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- MOT4400309 · 75p per kWh · 400 kW · 0.3 mi
- Fastest nearby
- MOT4400309 · 400 kW · 0.3 mi