# Premier Inn · GeniePoint

Web page: https://ampmap.co.uk/charger/the-geniepoint-network-premier-inn-4-uk

Premier Inn is an EV charging site in Rugeley, Staffordshire, run by GeniePoint. It has a single socket, with CHAdeMO and Type 2 at up to 50 kW, and the price is listed as £0.79/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Derby Road, A518/A50, ST14 5AA
- **Area:** Rugeley, Staffordshire, United Kingdom
- **Coordinates (latitude, longitude):** 52.90701, -1.85483

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 50 kW | 1 | Not listed |
| Type 2 | 22 kW | 1 | Not listed |

- **Price:** £0.79/kWh (from Open Charge Map)

## Site information

- **Operator:** GeniePoint
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at Premier Inn (GeniePoint)?

The listed price is £0.79/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Premier Inn (GeniePoint)?

Up to 50 kW DC via CHAdeMO, Type 2.

### How many charging sockets does Premier Inn (GeniePoint) have?

1 charging socket: 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2, 1 × 50 kW Type 2.

### Who operates Premier Inn?

Premier Inn is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

### How long does a Tesla Model Y Long Range take to charge at Premier Inn (GeniePoint)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Premier Inn (GeniePoint)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Premier Inn (GeniePoint)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Rugeley](https://ampmap.co.uk/chargers/united-kingdom/staffordshire/rugeley)
- [GeniePoint chargers](https://ampmap.co.uk/networks/geniepoint)

## Chargers near this site

- [EG Group Uttoxeter Services · EG Group EV Point](https://ampmap.co.uk/charger/eg-group-uttoxeter-services-uk) - CCS 250 kW · A50
- [Pod Point Tesco Superstore - Uttoxeter](https://ampmap.co.uk/charger/pod-point-tesco-superstore-uttoxeter-2-uk) - Type 2 7 kW · Brookside Road · From 44.4p/kWh
- [Bank House Hotel · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-bank-house-hotel-uk) - Blue Commando (2P+E) 7 kW, BS1363 3 Pin 13 Amp 3 kW · Church Street
- [Starbucks, Brookside Retail Park · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-starbucks-brookside-retail-park-uk) - CCS 300 kW, CHAdeMO 100 kW · Brookside Retail Park
- [Trinity Square Car Park · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-trinity-square-car-park-uk) - CCS / CHAdeMO 50 kW · Trinity Square Car Park, Trinity Road · From 89p/kWh
- [Shell Recharge Shell Uttoxeter](https://ampmap.co.uk/charger/shell-recharge-shell-uttoxeter-uk) - CCS 175 kW, CHAdeMO 70 kW · New Road · From 89p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/the-geniepoint-network-premier-inn-4-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 25 Mar 2024).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
