# Premier Inn Kettering · GeniePoint

Web page: https://ampmap.co.uk/charger/the-geniepoint-network-premier-inn-kettering-uk

Premier Inn Kettering is an EV charging site in Kettering, North Northamptonshire, run by GeniePoint. Its 3 sockets reach up to 50 kW, with Type 2 and CHAdeMO at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Rothwell Road, NN16 8FX
- **Area:** Kettering, North Northamptonshire, United Kingdom
- **Coordinates (latitude, longitude):** 52.40741, -0.75090

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 50 kW | 1 | Not listed |
| Type 2 | 22 kW | 1 | Not listed |

## Site information

- **Operator:** GeniePoint
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How fast is charging at Premier Inn Kettering (GeniePoint)?

Up to 50 kW DC via Type 2, CHAdeMO.

### How many charging sockets does Premier Inn Kettering (GeniePoint) have?

3 charging sockets: 1 × 50 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2.

### Who operates Premier Inn Kettering?

Premier Inn Kettering is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

### How long does a Tesla Model Y Long Range take to charge at Premier Inn Kettering (GeniePoint)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Premier Inn Kettering (GeniePoint)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Premier Inn Kettering (GeniePoint)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Kettering](https://ampmap.co.uk/chargers/united-kingdom/north-northamptonshire/kettering)
- [GeniePoint chargers](https://ampmap.co.uk/networks/geniepoint)

## Chargers near this site

- [Telford Way · Believ](https://ampmap.co.uk/charger/believ-telford-way-uk) - Type 2 22 kW · Telford Way
- [Linnell Way · Believ](https://ampmap.co.uk/charger/believ-linnell-way-uk) - Type 2 22 kW · Linnnell Way
- [Stanier Close · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-stanier-close-uk) - CCS 160 kW, CCS 80 kW · Stanier Close
- [Bee Cool ACS · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-bee-cool-acs-uk) - CCS / CHAdeMO / Type 2 50 kW · 19-9 Cunliffe Dr · From 89p/kWh
- [Richard Sanders](https://ampmap.co.uk/charger/richard-sanders-uk) - Type 2 7 kW · Brunel Close
- [Northfield Retail Park · Allego BV](https://ampmap.co.uk/charger/allego-bv-northfield-retail-park-uk) - CCS 200 kW · Northfield Avenue

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/the-geniepoint-network-premier-inn-kettering-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 4 May 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
