GeniePoint · EV charging site
Revive_BANES
Church Street, Bath, BA3 3QG
Revive_BANES is an EV charging site at Church Street in Bath, Bath and North East Somerset, run by GeniePoint. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. Amp Map lists 4 other charge points named Revive_BANES in Bath. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Odd Down AFC (InstaVolt Ltd), 5.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Revive_BANES (GeniePoint)?
Up to 50 kW DC via CHAdeMO, Type 2.
How many charging sockets does Revive_BANES (GeniePoint) have?
3 charging sockets: 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 1 × 50 kW Type 2.
Who operates Revive_BANES?
Revive_BANES is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Revive_BANES (GeniePoint)?
Odd Down AFC (InstaVolt Ltd) is 5.1 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Revive_BANES (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Revive_BANES (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Revive_BANES (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point MCM Garage Ltd
- Pod Point Dragonfly Leisure
- Best Western Centurion Hotel
- Revive_BANES
- EVC Best Western Centurion
- Pod Point The Grange
- Cheapest nearby
- Pod Point The Grange · 30p per kWh · 7 kW · 1.8 mi