GeniePoint · EV charging site
Revive_SGC
St James Street, Mangotsfield, BS16 9HE
Revive_SGC is an EV charging site at St James Street in Mangotsfield, South Gloucestershire, run by GeniePoint. Both of its sockets are 22 kW Type 2. Amp Map lists 1 other charge point named Revive_SGC in Mangotsfield. 5 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Huntsman Taverners Downend, Bristol (Osprey Charging), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Revive_SGC (GeniePoint)?
Up to 22 kW AC via Type 2.
How many charging sockets does Revive_SGC (GeniePoint) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Revive_SGC?
Revive_SGC is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest charger with 50 kW or more to Revive_SGC (GeniePoint)?
Huntsman Taverners Downend, Bristol (Osprey Charging) is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Revive_SGC (GeniePoint)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Revive_SGC (GeniePoint)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Revive_SGC (GeniePoint)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Huntsman Taverners Downend, Bristol
- Pod Point Tesco Superstore - Staple Hill
- Ultra Rapid EV Charging - Sainsbury's Emersons Green
- Willows Downend - Co-op Car Park
- MFG Blackhorse
- Page Road Short Stay Car Park
- Cheapest nearby
- Pod Point Tesco Superstore - Staple Hill · 44.4p per kWh · 7 kW · 0.8 mi
- Fastest nearby
- Willows Downend - Co-op Car Park · 200 kW · 0.9 mi