# Riverside 3 Car Park · GeniePoint

Web page: https://ampmap.co.uk/charger/the-geniepoint-network-riverside-3-car-park-uk

Riverside 3 Car Park is an EV charging site in Farnham, Surrey, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Mike Hawthorn Drive, GU9 7UG
- **Area:** Farnham, Surrey, United Kingdom
- **Coordinates (latitude, longitude):** 51.21746, -0.79037

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 22 kW | 1 | Not listed |
| Type 2 | 7 kW | 4 | Not listed |

- **Price:** £0.35/kWh. £10.00/hour overstay after 90 mins (DC) or 240 mins (AC) (from Open Charge Map)

## Site information

- **Operator:** GeniePoint
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at Riverside 3 Car Park (GeniePoint)?

The listed price is £0.35/kWh. £10.00/hour overstay after 90 mins (DC) or 240 mins (AC). Prices can change, so check the price at the charger before you start.

### How fast is charging at Riverside 3 Car Park (GeniePoint)?

Up to 50 kW DC via Type 2, CHAdeMO, CCS.

### How many charging sockets does Riverside 3 Car Park (GeniePoint) have?

1 charging socket: 1 × 22 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 2 × 7 kW Type 2, 2 × 7 kW Type 2.

### Who operates Riverside 3 Car Park?

Riverside 3 Car Park is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

### How long does a Tesla Model Y Long Range take to charge at Riverside 3 Car Park (GeniePoint)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Riverside 3 Car Park (GeniePoint)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Riverside 3 Car Park (GeniePoint)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Farnham](https://ampmap.co.uk/chargers/united-kingdom/surrey/farnham)
- [GeniePoint chargers](https://ampmap.co.uk/networks/geniepoint)

## Chargers near this site

- [Lidl-Farnham](https://ampmap.co.uk/charger/lidl-farnham-uk) - CCS 50 kW, CHAdeMO 50 kW · East Street
- [Rainbow Productions](https://ampmap.co.uk/charger/rainbow-productions-uk) - Type 2 22 kW · South Street
- [WaverleyBC · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-waverleybc-uk) - CHAdeMO 50 kW, Type 2 50 kW · Victoria Rd
- [Shell Recharge Shell Little Waitrose Folly Hill](https://ampmap.co.uk/charger/shell-recharge-shell-little-waitrose-folly-hill-uk) - CCS / CHAdeMO 180 kW · Odiham Rd, Upper Hale Rd · From 89p/kWh
- [HU - Aldershot South · GRIDSERVE](https://ampmap.co.uk/charger/gridserve-hu-aldershot-south-uk) - CCS 400 kW · Tongham Road, Junction of A331 and A31 · From 85p/kWh
- [Islamabad (Tilford) Public Car Park · ChargePoint](https://ampmap.co.uk/charger/chargepoint-islamabad-tilford-public-car-park-uk) - Type 2 22 kW · Sheephatch Lane

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/the-geniepoint-network-riverside-3-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 29 Apr 2021).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
