GeniePoint · EV charging site
Rothwell Leisure Centre
Wakefield Road, Oulton, Lofthouse, LS268EL
Rothwell Leisure Centre is an EV charging site in Lofthouse, City and Borough of Leeds, run by GeniePoint. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Toby Carvery Leeds (BP Pulse), 140 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Rothwell Leisure Centre (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does Rothwell Leisure Centre (GeniePoint) have?
3 charging sockets: 1 × 22 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2.
Who operates Rothwell Leisure Centre?
Rothwell Leisure Centre is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Rothwell Leisure Centre (GeniePoint)?
Toby Carvery Leeds (BP Pulse) is 140 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Rothwell Leisure Centre (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Rothwell Leisure Centre (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Rothwell Leisure Centre (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Toby Carvery Leeds
- Oulton Hall Hotel
- Marsh Street Car Park, Rothwell
- Pod Point Aldi - Rothwell
- Butcher Lane Car Park 2
- Rawowned Thorpe Lodge
- Cheapest nearby
- Pod Point Aldi - Rothwell · 25.2p per kWh · 7 kW · 1.1 mi
- Fastest nearby
- Oulton Hall Hotel · 100 kW · 0.2 mi