GeniePoint · EV charging site
School Lane
School Lane, Rochdale, OL14 7AA
School Lane is an EV charging site in Rochdale, Borough of Rochdale, run by GeniePoint. It has a single socket, with CCS and CHAdeMO at up to 50 kW, and charging is listed as free. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Market Place Car Park (GeniePoint), 3.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- free(from Open Charge Map, 29 Dec 2020)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at School Lane (GeniePoint)?
The listed price is free. Prices can change, so check the price at the charger before you start.
How fast is charging at School Lane (GeniePoint)?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does School Lane (GeniePoint) have?
1 charging socket: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2.
Who operates School Lane?
School Lane is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to School Lane (GeniePoint)?
Market Place Car Park (GeniePoint) is 3.9 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at School Lane (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at School Lane (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at School Lane (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.