# Stamford Court Conference Centre · GeniePoint

Web page: https://ampmap.co.uk/charger/the-geniepoint-network-stamford-court-conference-centre-uk

Stamford Court Conference Centre is an EV charging site in Oadby, Leicestershire, run by GeniePoint. Both of its sockets are 7 kW Type 2, and the price is listed as Â£0.60 + Â£0.25/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 18 Manor Road, LE2 2LH
- **Area:** Oadby, Leicestershire, United Kingdom
- **Coordinates (latitude, longitude):** 52.60917, -1.08424

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** Â£0.60 + Â£0.25/kWh (from Open Charge Map)

## Site information

- **Operator:** GeniePoint
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Stamford Court Conference Centre (GeniePoint)?

The listed price is Â£0.60 + Â£0.25/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Stamford Court Conference Centre (GeniePoint)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Stamford Court Conference Centre (GeniePoint) have?

2 charging sockets: 2 × 7 kW Type 2.

### Who operates Stamford Court Conference Centre?

Stamford Court Conference Centre is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

### How long does a Tesla Model Y Long Range take to charge at Stamford Court Conference Centre (GeniePoint)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Stamford Court Conference Centre (GeniePoint)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Stamford Court Conference Centre (GeniePoint)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Oadby](https://ampmap.co.uk/chargers/united-kingdom/leicestershire/oadby)
- [GeniePoint chargers](https://ampmap.co.uk/networks/geniepoint)

## Chargers near this site

- [East Street Car Park 1 · Blink Charging](https://ampmap.co.uk/charger/blink-charging-east-street-car-park-1-uk) - Type 2 7 kW · East Street Car Park
- [Oadby Owl (Leicester) · evyve](https://ampmap.co.uk/charger/evyve-oadby-owl-leicester-uk) - CCS 120 kW · 7 Glen Rd · From 85p/kWh
- [30 Avenue Road · Char.gy](https://ampmap.co.uk/charger/char-gy-30-avenue-road-uk) - Type 2 3 kW · 30 Avenue Road
- [31 East Avenue · Char.gy](https://ampmap.co.uk/charger/char-gy-31-east-avenue-uk) - Type 2 3 kW · 31 East Avenue
- [35 Portland Road · Char.gy](https://ampmap.co.uk/charger/char-gy-35-portland-road-uk) - Type 2 3 kW · 35 Portland Road
- [46-48 Clarendon Park Road · Char.gy](https://ampmap.co.uk/charger/char-gy-46-48-clarendon-park-road-uk) - Type 2 3 kW · 46 - 48 Clarendon Park Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/the-geniepoint-network-stamford-court-conference-centre-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 2 Nov 2018).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
