GeniePoint · EV charging site
Starbucks Pedmore Rd
Brierley Hill, DY51SF
Starbucks Pedmore Rd is an EV charging site in Brierley Hill, Dudley, run by GeniePoint. Both of its sockets are 75 kW CHAdeMO and Type 2. 13 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is zest-pair-city-tour (Zest Charging), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Starbucks Pedmore Rd (GeniePoint)?
Up to 75 kW DC via CHAdeMO, Type 2.
How many charging sockets does Starbucks Pedmore Rd (GeniePoint) have?
2 charging sockets: 1 × 75 kW CHAdeMO, 1 × 75 kW Type 2.
Who operates Starbucks Pedmore Rd?
Starbucks Pedmore Rd is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Starbucks Pedmore Rd (GeniePoint)?
zest-pair-city-tour (Zest Charging) is 0.1 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Starbucks Pedmore Rd (GeniePoint)?
A typical 10–80% rapid charge takes about 47 min on the 75 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Starbucks Pedmore Rd (GeniePoint)?
A typical 10–80% rapid charge takes about 35 min on the 75 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Starbucks Pedmore Rd (GeniePoint)?
A typical 10–80% rapid charge takes about 49 min on the 75 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- zest-step-year-bill
- zest-pair-city-tour
- zest-gold-type-plan
- zest-case-food-need
- Merry Hill, UK
- Level Street, Brierly Hill - Public Car Park
- Cheapest nearby
- Merry Hill, UK · 25p per kWh · 250 kW · 0.2 mi
- Fastest nearby
- Merry Hill, UK · 250 kW · 0.2 mi