GeniePoint · EV charging site
Stearmans Yard - Wells next to the Sea
Freeman Street, Wells-next-the-Sea, NR23 1BA
Stearmans Yard - Wells next to the Sea is an EV charging site in Wells-next-the-Sea, Norfolk, run by GeniePoint. All 6 of its sockets are 22 kW Type 2, and the price is listed as £0.48/kWh. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Running Horse, Fakenham (Osprey Charging), 8.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.48/kWh(from Open Charge Map, 24 Mar 2024)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Stearmans Yard - Wells next to the Sea (GeniePoint)?
The listed price is £0.48/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Stearmans Yard - Wells next to the Sea (GeniePoint)?
Up to 22 kW AC via Type 2.
How many charging sockets does Stearmans Yard - Wells next to the Sea (GeniePoint) have?
6 charging sockets: 2 × 22 kW Type 2, 2 × 22 kW Type 2, 2 × 22 kW Type 2.
Who operates Stearmans Yard - Wells next to the Sea?
Stearmans Yard - Wells next to the Sea is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest charger with 50 kW or more to Stearmans Yard - Wells next to the Sea (GeniePoint)?
Running Horse, Fakenham (Osprey Charging) is 8.1 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Stearmans Yard - Wells next to the Sea (GeniePoint)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Stearmans Yard - Wells next to the Sea (GeniePoint)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Stearmans Yard - Wells next to the Sea (GeniePoint)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.