# Tenby Multi-Storey Car Park - Top Floor · GeniePoint

Web page: https://ampmap.co.uk/charger/the-geniepoint-network-tenby-multi-storey-car-park-top-floor-uk

Tenby Multi-Storey Car Park - Top Floor is an EV charging site in Tenby, Pembrokeshire, run by GeniePoint. All 3 of its sockets are 22 kW Type 2, and the price is listed as £0.85 + £0.25/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Upper Park Road, SA70 7LT
- **Area:** Tenby, Pembrokeshire, United Kingdom
- **Coordinates (latitude, longitude):** 51.67151, -4.70349

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 4 | Not listed |

- **Price:** £0.85 + £0.25/kWh (from Open Charge Map)

## Site information

- **Operator:** GeniePoint
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Tenby Multi-Storey Car Park - Top Floor (GeniePoint)?

The listed price is £0.85 + £0.25/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Tenby Multi-Storey Car Park - Top Floor (GeniePoint)?

Up to 22 kW AC via Type 2.

### How many charging sockets does Tenby Multi-Storey Car Park - Top Floor (GeniePoint) have?

3 charging sockets: 4 × 22 kW Type 2.

### Who operates Tenby Multi-Storey Car Park - Top Floor?

Tenby Multi-Storey Car Park - Top Floor is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

### How long does a Tesla Model Y Long Range take to charge at Tenby Multi-Storey Car Park - Top Floor (GeniePoint)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Tenby Multi-Storey Car Park - Top Floor (GeniePoint)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Tenby Multi-Storey Car Park - Top Floor (GeniePoint)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Tenby](https://ampmap.co.uk/chargers/united-kingdom/pembrokeshire/tenby)
- [GeniePoint chargers](https://ampmap.co.uk/networks/geniepoint)

## Chargers near this site

- [Pod Point Five Arches Car Park Ltd](https://ampmap.co.uk/charger/pod-point-five-arches-car-park-ltd-uk) - Type 2 7 kW · South Parade · From 64.8p/kWh
- [Tenby Golf Club](https://ampmap.co.uk/charger/monta-aps-tenby-golf-club-1-l-uk) - Type 2 7 kW · Queensfield
- [North Beach, Tenby · Silverstone Green Energy](https://ampmap.co.uk/charger/silverstone-green-energy-north-beach-tenby-uk) - Type 2 120 kW · Gas Lane
- [Broadmead Boutique B&B](https://ampmap.co.uk/charger/monta-aps-broadmead-r-uk) - Type 2 7 kW
- [Penally Railway Station · Dragon Charging](https://ampmap.co.uk/charger/dragon-charging-penally-railway-station-uk) - Type 2 22 kW · Penally
- [Pod Point Great Wedlock Farm and Deer Park - The Cinema Building](https://ampmap.co.uk/charger/pod-point-great-wedlock-farm-and-deer-park-the-cinema-building-uk) - Type 2 7 kW · Gumfreston · From 75.6p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/the-geniepoint-network-tenby-multi-storey-car-park-top-floor-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 27 May 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
