Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

GeniePoint · EV charging site

The Eden Project (Chargepoint Genie)

Bodelva Road, St Austell, PL24 2SG

The Eden Project (Chargepoint Genie) is an EV charging site in St Austell, Cornwall, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Holmbush Inn St. Austell (GeniePoint), 1.8 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 7 Oct 2020Last verified 7 Oct 2020

Connectors

CCS · 50 kW1 connector
CHAdeMO · 50 kW1 connector
Type 2 · 43 kW1 connector

Site information

Operator
GeniePoint
Opening hours
Not published
Access
Public · membership required · access key required
Price
£1.00 + £0.30/kWh; £10.00 overstay after 65 mins(from Open Charge Map, 7 Oct 2020)
Phone (from Open Charge Map)
+44 800 999 4240
Notes
APT rapid charger
Getting there
Open 9am - 8pm weekdays and 9am to 6pm at weekends. Closed on Christmas Day. Charger located in Melon Parking area below Micro-wind turbine.

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at The Eden Project (Chargepoint Genie) (GeniePoint)?

The listed price is £1.00 + £0.30/kWh; £10.00 overstay after 65 mins. Prices can change, so check the price at the charger before you start.

How fast is charging at The Eden Project (Chargepoint Genie) (GeniePoint)?

Up to 50 kW DC via CHAdeMO, Type 2, CCS.

How many charging sockets does The Eden Project (Chargepoint Genie) (GeniePoint) have?

1 charging socket: 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 1 × 50 kW CCS.

Who operates The Eden Project (Chargepoint Genie)?

The Eden Project (Chargepoint Genie) is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

Where is the nearest other charger with 50 kW or more to The Eden Project (Chargepoint Genie) (GeniePoint)?

Holmbush Inn St. Austell (GeniePoint) is 1.8 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at The Eden Project (Chargepoint Genie) (GeniePoint)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Eden Project (Chargepoint Genie) (GeniePoint)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at The Eden Project (Chargepoint Genie) (GeniePoint)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 7 Oct 2020

Amp Map does not take payment. You pay the operator.