GeniePoint · EV charging site
Trevissome Park, Blackwater - Cornwall
A30, Truro, TR8 8HS
Trevissome Park, Blackwater - Cornwall is an EV charging site in Truro, Cornwall, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Trevissome Park (GeniePoint), 60 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £1.00 + £0.30/kWh; £10.00 overstay after 65 mins(from Open Charge Map, 24 Apr 2018)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Trevissome Park, Blackwater - Cornwall (GeniePoint)?
The listed price is £1.00 + £0.30/kWh; £10.00 overstay after 65 mins. Prices can change, so check the price at the charger before you start.
How fast is charging at Trevissome Park, Blackwater - Cornwall (GeniePoint)?
Up to 50 kW DC via CHAdeMO, Type 2, CCS.
How many charging sockets does Trevissome Park, Blackwater - Cornwall (GeniePoint) have?
1 charging socket: 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 1 × 50 kW CCS.
Who operates Trevissome Park, Blackwater - Cornwall?
Trevissome Park, Blackwater - Cornwall is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Trevissome Park, Blackwater - Cornwall (GeniePoint)?
Trevissome Park (GeniePoint) is 60 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Trevissome Park, Blackwater - Cornwall (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Trevissome Park, Blackwater - Cornwall (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Trevissome Park, Blackwater - Cornwall (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.