GeniePoint · EV charging site
Trowbridge Railway Station
Station Approach, Trowbridge, BA14 8HW
Trowbridge Railway Station is an EV charging site in Trowbridge, Wiltshire, run by GeniePoint. Both of its sockets are 22 kW Type 2, and charging is listed as free. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Instavolt Cradle Bridge Retail Park (InstaVolt Ltd), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Price
- Free(from Open Charge Map, 2 Nov 2018)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Notes
- GE Industrial Durastation charge point
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Trowbridge Railway Station (GeniePoint)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Trowbridge Railway Station (GeniePoint)?
Up to 22 kW AC via Type 2.
How many charging sockets does Trowbridge Railway Station (GeniePoint) have?
2 charging sockets: 2 × 22 kW Type 2.
Who operates Trowbridge Railway Station?
Trowbridge Railway Station is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest charger with 50 kW or more to Trowbridge Railway Station (GeniePoint)?
Instavolt Cradle Bridge Retail Park (InstaVolt Ltd) is 0.4 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Trowbridge Railway Station (GeniePoint)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Trowbridge Railway Station (GeniePoint)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Trowbridge Railway Station (GeniePoint)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Bythesea Road
- The Greyhound 1
- Instavolt Cradle Bridge Retail Park
- Pod Point Tesco Extra - Trowbridge
- Pod Point Platinum Trowbridge - Vauxhall
- Beeches Farmhouse B&B & Pig Wig Cottages Self Catering
- Cheapest nearby
- Pod Point Platinum Trowbridge - Vauxhall · Free · 7 kW · 1.8 mi
- Fastest nearby
- Instavolt Cradle Bridge Retail Park · 120 kW · 0.4 mi