GeniePoint · EV charging site
Ty Glas Road
Ty Glas Road, Cardiff, CF14 5EB
Ty Glas Road is an EV charging site in Cardiff, run by GeniePoint. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is InstaVolt Bannatyne Health Club & Spa (InstaVolt Ltd), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Ty Glas Road (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does Ty Glas Road (GeniePoint) have?
3 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2.
Who operates Ty Glas Road?
Ty Glas Road is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Ty Glas Road (GeniePoint)?
InstaVolt Bannatyne Health Club & Spa (InstaVolt Ltd) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Ty Glas Road (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ty Glas Road (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Ty Glas Road (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- InstaVolt Bannatyne Health Club & Spa
- Pod Point Cardiff & Vale University Health Board
- Three Arches, Cardiff
- Penlline Road, Cardiff
- Hollybush Inn Cardiff
- Pod Point University Of Wales Hospital
- Cheapest nearby
- Pod Point Cardiff & Vale University Health Board · 27.6p per kWh · 7 kW · 0.5 mi
- Fastest nearby
- Three Arches, Cardiff · 75 kW · 1 mi