GeniePoint · EV charging site
Webbs Hagley Garden Centre
Kidderminster Road South, Hagley, Stourbridge, DY9 0JB
Webbs Hagley Garden Centre is an EV charging site in Stourbridge, Dudley, run by GeniePoint. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is The Bell (M & B) Stourbridge (BP Pulse), 3.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Webbs Hagley Garden Centre (GeniePoint)?
Up to 50 kW DC via CHAdeMO, Type 2.
How many charging sockets does Webbs Hagley Garden Centre (GeniePoint) have?
3 charging sockets: 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 1 × 50 kW Type 2.
Who operates Webbs Hagley Garden Centre?
Webbs Hagley Garden Centre is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Webbs Hagley Garden Centre (GeniePoint)?
The Bell (M & B) Stourbridge (BP Pulse) is 3.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Webbs Hagley Garden Centre (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Webbs Hagley Garden Centre (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Webbs Hagley Garden Centre (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- The Bell (M & B) Stourbridge
- Pod Point Tesco Extra - Stourbridge
- Manor House of Whittington, Kinver
- Tesco (Stourbridge)
- Land Oak, Kidderminster
- Pod Point Hogarths Stone Manor LTD
- Cheapest nearby
- Pod Point Tesco Extra - Stourbridge · 44.4p per kWh · 7 kW · 3.2 mi
- Fastest nearby
- Tesco (Stourbridge) · 75 kW · 3.5 mi